The 6 Construction Phases

by

in

The tool can help during all construction stages, including design, planning, planning and construction, and can also help users scale their activities, control costs, re-tune resources and shorten construction times. However, a good construction manager will tell you that optimal results start with carefully designed and defined planning. Planning often includes early retention of professionals such as engineers and consultants so that their input can be included in the development plan.

The pre-construction phase includes drawing up a strategic plan for the project, creating a design, obtaining permits or rights, and bringing together the labor and resources required for construction. Pre-construction services can provide owners with a formal approach to developing costs, scope and planning to ensure construction is timely and under control. It is during this IntelliSpeX software review phase that the project team is organized, tailored to his vision and where the basis of communication and the project process is laid. Without a solid foundation, a construction project can quickly become messy, leading to communication gaps, process holes and possible schedule delays. Your construction manager will be working on his own set of core tasks at this stage.

Planning starts before the project starts, including selecting the best building methodologies, preparing the building schedule / program and organizing resources. It also includes daily and weekly planning throughout the life of the project to ensure that all tasks are completed. In closing, project managers can hold a post mortem meeting to discuss which parts of the project have been achieved and have not achieved the objectives.

Thanks to the fact that it had a clearly defined construction project plan and a way to track performance and obstacles, it is well equipped to perform an even more successful construction planning process next time. You know where the obstacles are and what mistakes have been made, which will inform you how to change the next plan to maximize success. When construction is complete, the next phase is known as the process shutdown phase. At this point, it is important to ensure that everything is completed before the transition to occupation.

The construction project management team’s attention is focused on more tangible issues. Ensuring that the core components and the right tools are in the right place at the right time is critical to keeping a project on time and on budget. With the design in hand, the project goes to the pre-construction phase. Here, the construction project coordinator confirms that the assembled team works smoothly. The focus then focuses on how best to use time, funds and other resources to successfully complete the project. A strategy is defined, responsibilities are assigned and unforeseen events are planned.

Individual traders and specialty suppliers use countertops to make store drawings for items such as granite finishes, cabinets and countertops, structural steel, etc. The store drawings describe the specific components of the building and generally occur after the last design phase but before the start of the construction phase. The drawings are arranged according to the instructions in document A201. The architect / engineer will also verify each store’s drawing for accurate measurements and compliance with the design of the planned building.

The process of building the different building elements on a construction site is called the construction construction process. The construction of the building has several phases such as planning, design, terrain preparation and construction of the foundation plinth, construction of columns, beams and plates, plastering and finishing work. The process of building the different elements of a building on a construction site is called the construction construction process. As each phase of the construction life cycle becomes easier to understand, so do the possibilities of project managers and building leaders to streamline the process. From the beginning to the conclusion of the project, organizations have the opportunity to develop quality terms and determine project size to meet deadlines and save money, both in the short and long term. Work plans and specifications provide information that allows general contractors to estimate the construction costs of projects.